Extension of clean spaces for the H6b production hall in Brandýs nad Labem
In the spring of 2021, the 700 center simultaneously carried out two turnkey projects on the site of the Continental production plant in Brandýs nad Labem, namely an extension of the H6 production building, which the center undertook in 2019, and the newly built A4 administrative building on the area of the former parking lot.
The H6b extension has a floor plan area of 1000 m2 and together with H6 creates an area of 2000 m2 of clean space on the 1st floor for the specialized production of touch screens for the automotive industry. The 2nd floor houses the equipment floor, where the equipment for air-conditioning, compressed air and cooling for the needs of production in the clean spaces are located.
Both buildings were project-based turnkey constructions. The H6b extension has already been certified, and the administrative building will be finished in 3/2022.
What we did
- 01 Earthworks and building the foundation
- 02 Vertical and horizontal constructions and lintels
- 03 Floors and paved surfaces
- 04 Interior and exterior wall modifications
- 05 Plumbing and fittings
- 06 Insulation against ground moisture and waterproofing
- 07 Thermal insulation
- 08 Final landscaping
- 09 Clean areas