We are extending the production hall of˛the wire drawing plant

We are extending the concrete building of the production hall with a new steel hall over 37 metres long. The project also includes a steel shelter over the road, which connects the new hall with the existing building, and an extension, which houses the process water production, compressor station and electrical substation.

The new steel hall is completely designed from steel frames with a gable roof and the entire hall will be clad with sandwich panels.

The adjacent steel shelter to cover the existing road will have a pitched roof designed in trapezoidal sheet metal. The steel extension will also have a pitched roof.

In addition, we will provide drainage for the new buildings, provide gas heating and provide a new fire water main connection. 


7. 4. 2025 Interest, News

This website uses cookies.

We use cookies to personalize content and ads, provide social media features and analyze our traffic. We also share information about the use of our site with our social media, advertising and analytics partners. They may use the data together with other information they collect about you while using their services.