We handed over the revitalized hall in the Tatra area
Before the renovation, the hall was a warehouse. Now the premises will be used for special and technically demanding modifications of Tatra vehicles, which previously affected the fluidity of the main production line.
- In the affected part of the hall, all the equipment (HVAC, piping, electrical wiring) has been dismantled.
- Subsequently, the internal walls of the hall were repaired, the roof of the hall including the roof skylight was repaired and a new floor was made including an assembly pit, the building was insulated with mineral wool sandwich panels and also insulated with polystyrene 100 mm thick including plaster.
- New electrical wiring and lighting were installed.
- Newly installed hot water heating of the hall, air conditioning and piping of air and corgon.
Inside the hall a new vestibule (overhead storage, men/women's toilet, cleaning room and rest room are built.
Contracting authority: TATRA TRUCKS a.s.
Date of execution of the work: 22.04.2024 - 30.09.2024